Naas Fiesta wet belt replacement is quoted by whichever approved garage covers your Eircode, and we've vetted it for the 1.0 EcoBoost. Once it's done, the next change on a 1.0 EcoBoost falls 10 years or about 160,000 km after the invoice, whichever arrives first.
Naas Fiesta with new belts? Put the next due date in the diary on the day.
| What to watch | On a Fiesta |
|---|---|
| Oil grade | The Ford specification in your handbook, such as WSS-M2C948-B on earlier 1.0 EcoBoosts or WSS-M2C954-A1 on later and mild hybrid Fiestas, with about 4.6 litres going in at a belt change |
| How often | On Ford's schedule and never late, since a Fiesta kept to short hops rarely brings its oil up to heat |
| Belt checks | The EcoBoost belts can't be reached from outside the engine, so the oil and the invoices are the only checks between changes |
| After the change | Belt debris can clog the turbo's small oil filter and the cam phasers, so ask what the garage found and cleaned |
| Proof for the cover | Invoices with dates and the oil grade. Any Ford support begins with a dealer inspecting the Fiesta and reviewing its full history |
| Next belt change | 10 years or about 160,000 km after the Fiesta's last belt invoice, whichever arrives first |
You'll find cover terms and the engine's history in our Fiesta wet belt guide.
Your Naas Eircode decides which approved garage the Fiesta goes to, as with all of Kildare & Leinster. Other cars are listed on the Naas wet belt page.
It can. Give it the belt invoice so the oil grade and change date go on the record, and if manufacturer cover might still apply, keep to the maker's schedule and check with a dealer before booking.
Your engine's interval runs from the invoice's date or km reading, whichever is reached first. The table above gives the usual interval for the Fiesta.
Ten years or about 160,000 km after the date and km on the invoice, whichever is reached first. A Fiesta doing high km a year will reach the km figure long before the date.
Type in the Fiesta's reg and your Eircode. The invoice from the job then sets the date for the next pair of belts.