Galway owners can have their Peugeot 3008's wet belt replacement quoted by the approved garage covering their Eircode. Once it's done, note how much oil goes in between services, as climbing use often comes before belt trouble on the PureTech 130.
I'll nudge you to log every top-up on your Galway 3008 once the belt's new.
| What to watch | On a 3008 |
|---|---|
| Oil grade | The oil approval printed in the 3008's handbook for the PureTech 130, asked for by name and shown on the invoice |
| How often | Peugeot's time and distance plan, brought forward on a 3008 that tows, sits in traffic or mostly does short runs |
| Belt checks | Ask for the belt width to be gauged through the oil filler cap at every 3008 service |
| Oil use | Note how much goes into the 3008 between services, as climbing use often comes before belt trouble |
| Proof for the cover | Servicing to Peugeot's plan with the right oil, shown by recent itemised invoices or a stamped book. Independent servicing counts if it follows that plan with the right parts, and a Peugeot dealer handles any claim and confirms whether the 3008 qualifies |
| Next belt change | 6 years or 100,000 km after the last one, whichever the 3008 reaches first |
You'll find cover terms and the engine's history in our 3008 wet belt guide.
Galway enquiries reach the approved garage for their Eircode, as with any address in Galway & Connacht. Every garage on the network has been vetted by us. A car that isn't a 3008 can start at our Galway page.
It can. Give it the belt invoice so the oil grade and change date go on the record, and if manufacturer cover might still apply, keep to the maker's schedule and check with a dealer before booking.
Your engine's interval runs from the invoice's date or km reading, whichever is reached first. The table above gives the usual interval for the 3008.
Write down the date, the amount and the km each time you top up, and take the notes to every service. A pattern of rising use is worth showing a garage before it turns into belt trouble.
Your reg and Eircode bring the quote. Keep a note of every top-up from the day the new belt goes in.